...so the house has been moved!! We did it on a roll back and although it cost a little more money it went pretty smooth. The house sits on a slight incline and I leveled it using a pressure treated 2x8 on the high end and a large railroad tie on the low end. It is sitting flat and I added two small decks to the front and covered them with a large nylon tarp. I have been sleeping there for a couple of weeks and it is wonderful...falling asleep looking at the leaves change through the sliding glass door while listening to the creek down below.
Now it is time to get to work. I will add photo's as I progress with all the projects that are to come..
New roof
Rain water collection
Install ceiling
Outdoor shower/bathroom
Wood fired hot tub
Micro Hydro power plant and solar panels
I have a lot of work to do....